Does a C-or-better EPC sell for more in GU35 8 (East Hampshire)?

No measurable EPC premium here. In postcode sector GU35 8 (East Hampshire), comparing like with like — same floor area, property type, build period and year of sale — the difference is −2.5% (95% range −5.7% to +0.9%): the EPC band itself is not reflected in sale prices here. The raw gap is bigger: C+ homes sold for 5% less per square metre than D–G homes (median £4,013 vs £4,213, 781 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

−2.5%like-for-like: no measurable difference (95% range −5.7% to +0.9%)
−5%raw gap per m² (before like-for-like)
781sales matched to a certificate
69%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 125 m² against 114 m² for D–G; both groups are most often built in 1967–1975; 73% of C+ and 86% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)−5%—
Whole price, nothing held equal−0.5%−7.9% to +7.6%
Same floor area−6.0%−9.7% to −2.2%
+ same property type+0.3%−3.0% to +3.7%
+ same build period+1.8%−1.8% to +5.5%
+ same year of sale−2.5%−5.7% to +0.9%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in GU35 8

EPC band (last certificate before sale)SalesMedian £ per m²
A8too few
B53£4,596
C235£3,770
D357£4,156
E99£4,344
F23£4,610
G6too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached181£4,298349£4,438
Semi-detached35£4,25567£3,986
Terraced71£3,07764£3,224
Flat / maisonette9—5—

Compared with the wider area

AreaSalesLike-for-like95% range
Sector GU35 8781−2.5%−5.7% to +0.9%
District GU354,748−2.1%−3.3% to −0.8%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in GU35 8 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)121 (1,850 meters)
Median gas use per meter (median of postcodes)18,125 kWh
Gas-heated homes with an EPC1,302
Energy implied by their certificates (median)21,431 kWh
Metered gas as a share of the certificate figure (median of 115 postcodes)69% (middle half 59%–79%)

Certificates by band imply: B 10,482 kWh (55 homes) · C 14,607 kWh (526 homes) · D 24,076 kWh (553 homes) · E 35,619 kWh (135 homes) · F 52,177 kWh (24 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in GU35 8?

SSEN does not publish spare capacity for street substations, so this is the answer for the wider district fed by the Bordon primary substation (33/11 kV), not for your street. Its winter demand headroom for 2027 is 8.4 MVA (lowest of SSEN's scenarios) — room for about 4,920 heat pumps at 1.7 kW each, or 55% of the 8,984 gas-heated homes with an energy certificate in its supply area. In that scenario the headroom runs out in 2034.

Primary substationShare of the sector's gas homesHeadroom 2027Gas homes in its areaRoom for heat pumpsHeadroom 2030 / 2035 (Holistic Transition)
Bordon100%8.4 MVA8,984≈ 4,920 (55%)5.9 / −3.6 MVA

Across the sector, about 720 of 1,302 gas-heated homes (55%) could switch within the primary substations' 2027 headroom.

Caveat: a primary substation feeds a whole town or several villages. Your street's own substation can be full while the primary has room, and the other way round. Headroom: SSEN Network Scenario Headroom Report 2026, winter demand headroom after contracted connections (MVA ≈ MW). Homes: postcodes whose centre lies inside SSEN's published supply area (19 October 2026). A full primary substation means reinforcement (usually a delay), not a refusal. All areas and the method.

781 of 851 house and flat sales in the sector since 2015 (92%) were matched to a certificate.