EPC Price Check

Methodology and sources

Does a better energy rating (EPC) sell for more on your street? For every postcode sector in England and Wales with enough sales: sold prices per square metre by EPC band, the raw gap between C-or-better and D-to-G homes, and the like-for-like difference once size, type, build period and year of sale are taken into account — plus how much gas homes really use compared with what their certificates suggest.

The short answer

Homes with a better energy rating do sell for more per square metre, but mostly because they are different homes: newer, of different sizes and types. Once floor area, property type, build period and year of sale are held equal, the premium for an EPC of C or better is close to zero across England and Wales, and in most postcode sectors it cannot be told apart from zero.

Data and matching

Gas comparison

DESNZ publishes weather-corrected gas use per meter by postcode (postcodes with fewer than 5 meters are suppressed). We compare its median with the energy implied by the certificates of gas-heated homes in the same postcode (primary energy per m² × floor area ÷ 1.13). Certificates estimate use under standard occupancy; real households in poorly rated homes heat less, so certificates overstate their use (the “prebound effect”).

Conservation areas: homes and permitted development

Can the local grid take heat pumps?

Sources and licences

SourcePublisherData dateLicence
Price Paid Data
Standard sales (category A) from January 2015; only aggregates are shown, no individual sales or addresses.
HM Land Registry30 September 2026Open Government Licence v3.0
Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0. Address data: Contains Royal Mail data © Royal Mail copyright and database right 2026, used with permission.
Energy Performance of Buildings Register (domestic certificates)
EPC band, floor area, build period and primary energy of the latest certificate; bulk download of England and Wales domestic certificates.
Ministry of Housing, Communities and Local Government1 November 2026Open Government Licence v3.0
Energy certificates: Energy Performance of Buildings Register (MHCLG), Open Government Licence v3.0; addresses: Royal Mail and Ordnance Survey data used only for matching, not shown.
Postcode level domestic gas consumption (2024)
Weather-corrected gas use per meter; postcodes with fewer than 5 meters are suppressed by DESNZ.
Department for Energy Security and Net Zero31 December 2024Open Government Licence v3.0
Contains public sector information licensed under the Open Government Licence v3.0: postcode level domestic gas consumption 2024, Department for Energy Security and Net Zero.
ONS Postcode Directory (August 2026)
Regions and local authorities of postcode sectors.
Office for National Statistics1 August 2026Open Government Licence v3.0
Source: Office for National Statistics licensed under the Open Government Licence v3.0. Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026.
Conservation areas, Article 4 direction areas and listed buildings (planning.data.gov.uk)
Boundaries of conservation areas and Article 4 areas as published by councils; listed buildings as points.
Ministry of Housing, Communities and Local Government and local planning authorities3 November 2026Open Government Licence v3.0
Contains public sector information licensed under the Open Government Licence v3.0: planning.data.gov.uk (MHCLG) — conservation area, Article 4 direction area and listed building data provided by local planning authorities and Historic England.
OS Open UPRN
Coordinates of every address (UPRN), used to place homes with an energy certificate inside or outside a boundary; addresses are not shown.
Ordnance Survey3 November 2026Open Government Licence v3.0
Contains OS data © Crown copyright and database right 2026 (OS Open UPRN), Open Government Licence v3.0.
Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Parts 1 and 14
Permitted development rules for houses; text as in force on 21 October 2026 (rules change: check the current version before work).
legislation.gov.uk (The National Archives)21 October 2026Open Government Licence v3.0
Contains public sector information licensed under the Open Government Licence v3.0: legislation.gov.uk.
UK Power Networks Secondary Sites; UK Power Networks Secondary Substation Distribution Areas
Utilisation band, transformer rating and customers of each local (secondary) substation; supply areas traced from the low-voltage network. Sites with five or fewer customers are withheld by UK Power Networks.
UK Power Networks15 June 2026Creative Commons Attribution 4.0
UK Power Networks, UK Power Networks Secondary Sites, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-secondary-sites/, 15 June 2026; UK Power Networks, UK Power Networks Secondary Substation Distribution Areas, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn_secondary_postcode_area/, 12 June 2024 (CC BY 4.0). Contains OS data © Crown copyright and database right.
SP ENW - Capacity - Distribution TX; SP ENW - Substation - DSO Primary Polygons
Rating, estimated maximum demand and demand headroom (kVA) of each distribution transformer; primary substation areas used only to keep postcodes inside SP Electricity North West's area.
SP Electricity North West24 March 2026Creative Commons Attribution 4.0
SP Electricity North West, SP ENW - Capacity - Distribution TX (24 March 2026) and SP ENW - Substation - DSO Primary Polygons (5 November 2026), Creative Commons Attribution 4.0. Contains OS data © Crown copyright and database right.
NPg Site Utilisation; Substation Sites List
Maximum demand, firm capacity, transformer headroom (kW) and customers of each distribution substation; postcodes each substation feeds (withheld for five or fewer customers).
Northern Powergrid3 August 2026Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data. NPg Site Utilisation (3 August 2026) and Substation Sites List (23 July 2026), Northern Powergrid Open Data Licence v1.0. Contains OS data © Crown copyright and database right.
SEPD Network Scenario Headroom Report 2026; SEPD Primary Supply Areas
Winter demand headroom of primary substations (33/11 kV) by year and scenario, after contracted connections; supply areas from addresses (Voronoi). Street substation capacity is not published by SSEN.
SSEN Distribution (Southern Electric Power Distribution)19 October 2026Creative Commons Attribution 4.0
SSEN Distribution: SEPD Network Scenario Headroom Report 2026 and SEPD Primary Supply Areas (19 October 2026), Creative Commons Attribution 4.0.