EPC Price Check

Can the local grid take heat pumps?

On the network operators' own figures, about 77% of gas-heated homes with an energy certificate in the 3,372 postcode sectors we can check street by street could switch to a heat pump before their local substation runs out of spare capacity, at 1.7 kW added to the winter peak per heat pump. Only 1.4% of the 133,592 local substations of UK Power Networks, SP Electricity North West and Northern Powergrid are already full, but in 137 sectors all gas-heated homes could switch and in 99 fewer than half could. A full substation means the network operator must reinforce it before more heat pumps connect — usually a delay, not a refusal.

Data: substation data 24 March 2026 – 19 October 2026, EPC register November 2026 · calculated 5 November 2026 · Methodology and sources

77%of gas-heated homes could switch within local spare capacity
3,372postcode sectors checked street by street
1.4%of local substations already full
1.7 kWadded to the winter peak per heat pump

By network operator

Network operator (area)Local substationsAlready fullSpare capacityGas homes could switchSectors with the answer
SP Electricity North West (North West England; data 24 March 2026)32,7991,003 (3.1%)6,976 MVA1,193,050 of 1,478,304 (81%)678
Northern Powergrid (North East England, Yorkshire and northern Lincolnshire; data 3 August 2026)28,043450 (1.6%)8,997 MVA1,592,550 of 1,871,453 (85%)803
UK Power Networks (London, the South East and the East of England; data 15 June 2026)72,750478 (0.7%)15,244 MVA3,189,640 of 4,353,175 (73%)1,891

Local substations: 11 kV (or 6.6 kV) to 400 V transformers that feed streets. Full: no spare capacity left (UK Power Networks: utilisation of 100% or more). Gas homes: homes whose latest energy certificate shows mains gas heating, on postcodes linked to a substation; “could switch” shares each substation's spare capacity among them.

How many homes could switch, sector by sector

Gas-heated homes that could switch within local spare capacityPostcode sectors
fewer than 25%3
25% to 50%96
50% to 75%934
75% to just under all2,204
all135

Where local spare capacity runs out first

Postcode sectors where the smallest share of gas-heated homes could switch before their street substations are full.

SectorNetwork operatorGas homesCould switchSubstations already full
CA24 3 CumberlandSP Electricity North West28130 (11%)2 of 15
TS1 3 MiddlesbroughNorthern Powergrid1,506240 (16%)0 of 12
DA18 4 BexleyUK Power Networks1,656400 (24%)0 of 9
SK23 6 High PeakSP Electricity North West734180 (25%)11 of 26
SW5 9 Kensington and ChelseaUK Power Networks3,083810 (26%)1 of 32
CA7 2 CumberlandSP Electricity North West15140 (28%)6 of 64
CA6 4 CumberlandSP Electricity North West514160 (31%)13 of 124
NW10 5 BrentUK Power Networks3,4221,070 (31%)0 of 24
WA3 6 WarringtonSP Electricity North West3,092970 (31%)11 of 67
CR7 8 CroydonUK Power Networks4,6761,490 (32%)0 of 34
NW10 4 BrentUK Power Networks2,703870 (32%)0 of 20
SE22 9 SouthwarkUK Power Networks3,0591,040 (34%)0 of 21
CR0 6 CroydonUK Power Networks6,1442,150 (35%)1 of 43
BN2 3 Brighton and HoveUK Power Networks3,7671,370 (36%)1 of 18
CT11 9 ThanetUK Power Networks2,443890 (37%)0 of 22
IG3 8 RedbridgeUK Power Networks3,7641,390 (37%)0 of 30
SE25 4 CroydonUK Power Networks3,7551,390 (37%)0 of 36
LA16 7 Westmorland and FurnessSP Electricity North West932350 (37%)4 of 23
DA11 0 GraveshamUK Power Networks2,058770 (37%)0 of 26
DA10 0 DartfordUK Power Networks1,949730 (37%)0 of 13
NW1 9 CamdenUK Power Networks2,524950 (38%)0 of 26
KT19 7 Epsom and EwellUK Power Networks436170 (38%)0 of 5
RM9 5 Barking and DagenhamUK Power Networks3,1421,210 (39%)2 of 25
M11 4 ManchesterSP Electricity North West2,9161,130 (39%)3 of 21
NW2 3 CamdenUK Power Networks2,6141,030 (39%)0 of 24

SSEN area: primary substations with the least headroom

SSEN Distribution does not publish spare capacity for street substations, so in its southern England area (853 sector pages) the answer is given for the primary substation (33/11 kV) that feeds the district — a much coarser view. Primary substations with at least 500 gas-heated homes, by the share that could switch within the 2027 winter headroom (lowest of SSEN's scenarios):

Primary substationHeadroom 2027Gas homes in its areaRoom for heat pumpsSectors
East Howe−0.3 MVA9,432noneBH10 4, BH10 5, BH11 8, BH11 9
Vicarage Farm Road (upstream constraint)−16.9 MVA9,299noneTW3 3, TW3 4, TW4 6, TW4 7
Ashling Road (upstream constraint)−2.2 MVA8,589nonePO18 8, PO19 3, PO19 5
Ashton Park (upstream constraint)−7.5 MVA8,112noneBA14 0, BA14 6, BA14 7
Chichester (upstream constraint)−5.7 MVA7,285nonePO18 0, PO20 3, PO21 5
Frimley−1.4 MVA7,015noneGU15 1, GU16 7, GU16 8, GU16 9
Wootton Road (upstream constraint)−1.9 MVA6,122noneOX13 6, OX14 1, OX14 2
St Cross−6.3 MVA6,032noneSO22 4, SO22 5, SO23 9
St Johns−10.5 MVA6,019noneRG14 5, RG14 6, RG14 7, RG19 8
Bilsham (upstream constraint)−2.1 MVA5,880noneBN18 0, BN18 9, PO22 0, PO22 6
Rose Hill−8.8 MVA5,691noneOX4 3, OX4 4
Yarnton (upstream constraint)−13.4 MVA5,408noneOX5 1, OX5 2
Grove (upstream constraint)−8.5 MVA4,909noneOX12 0, OX12 9
Emsworth (upstream constraint)−1.3 MVA4,867nonePO10 7, PO10 8
North Fareham (upstream constraint)−3.6 MVA4,836nonePO15 6, PO16 7, PO17 5, PO17 6

SSEN Network Scenario Headroom Report 2026 and Primary Supply Areas (19 October 2026). Across all 425 SEPD primary substations, 30 have no winter headroom for 2027 in the lowest scenario.

How this is calculated

Caveats