Does a C-or-better EPC sell for more in GU35 0 (East Hampshire)?

No premium here: C+ homes sold for slightly less. In postcode sector GU35 0 (East Hampshire), comparing like with like — same floor area, property type, build period and year of sale — homes rated C or better sold for 2.5% less (95% range −4.1% to −0.9%). The raw gap is different: C+ homes sold for 1% more per square metre than D–G homes (median £3,646 vs £3,614, 2,684 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

−2.5% ▼like-for-like: small discount (95% range −4.1% to −0.9%)
+1%raw gap per m² (before like-for-like)
2,684sales matched to a certificate
69%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 84 m² against 82 m² for D–G; the most common build period is 2012 onwards for C+ and 1983–1990 for D–G; 39% of C+ and 56% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)+1%—
Whole price, nothing held equal+4.9%+1.4% to +8.5%
Same floor area−1.0%−3.1% to +1.1%
+ same property type+5.9%+4.1% to +7.7%
+ same build period+1.3%−0.6% to +3.3%
+ same year of sale−2.5%−4.1% to −0.9%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in GU35 0

EPC band (last certificate before sale)SalesMedian £ per m²
A68£3,919
B865£3,698
C963£3,455
D660£3,617
E104£3,442
F20£3,778
G4too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached248£3,846213£3,889
Semi-detached483£3,750229£3,720
Terraced863£3,683243£3,562
Flat / maisonette302£2,943103£2,741

Compared with the wider area

AreaSalesLike-for-like95% range
Sector GU35 02,684−2.5%−4.1% to −0.9%
District GU354,748−2.1%−3.3% to −0.8%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in GU35 0 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)246 (5,209 meters)
Median gas use per meter (median of postcodes)8,525 kWh
Gas-heated homes with an EPC4,107
Energy implied by their certificates (median)10,779 kWh
Metered gas as a share of the certificate figure (median of 234 postcodes)69% (middle half 59%–92%)

Certificates by band imply: A 3,738 kWh (153 homes) · B 5,685 kWh (1,167 homes) · C 11,458 kWh (1,751 homes) · D 17,841 kWh (909 homes) · E 28,991 kWh (117 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in GU35 0?

SSEN does not publish spare capacity for street substations, so this is the answer for the wider district fed by the Bordon primary substation (33/11 kV), not for your street. Its winter demand headroom for 2027 is 8.4 MVA (lowest of SSEN's scenarios) — room for about 4,920 heat pumps at 1.7 kW each, or 55% of the 8,984 gas-heated homes with an energy certificate in its supply area. In that scenario the headroom runs out in 2034.

Primary substationShare of the sector's gas homesHeadroom 2027Gas homes in its areaRoom for heat pumpsHeadroom 2030 / 2035 (Holistic Transition)
Bordon99%8.4 MVA8,984≈ 4,920 (55%)5.9 / −3.6 MVA

Across the sector, about 2,270 of 4,103 gas-heated homes (55%) could switch within the primary substations' 2027 headroom.

Caveat: a primary substation feeds a whole town or several villages. Your street's own substation can be full while the primary has room, and the other way round. Headroom: SSEN Network Scenario Headroom Report 2026, winter demand headroom after contracted connections (MVA ≈ MW). Homes: postcodes whose centre lies inside SSEN's published supply area (19 October 2026). A full primary substation means reinforcement (usually a delay), not a refusal. All areas and the method.

2,684 of 2,820 house and flat sales in the sector since 2015 (95%) were matched to a certificate.

How this is calculated

Caveats