No measurable EPC premium here. In postcode sector BA11 1 (Somerset), comparing like with like — same floor area, property type, build period and year of sale — the difference is +2.9% (95% range −1.0% to +7.0%): the EPC band itself is not reflected in sale prices here. The raw gap is different: C+ homes sold for 3% more per square metre than D–G homes (median £3,288 vs £3,200, 1,514 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+2.9%like-for-like: no measurable difference (95% range −1.0% to +7.0%)
+3%raw gap per m² (before like-for-like)
1,514sales matched to a certificate
54%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 78 m² against 91 m² for D–G; the most common build period is 2012 onwards for C+ and before 1900 for D–G; 32% of C+ and 20% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)+3%—
Whole price, nothing held equal−8.6%−13.0% to −4.1%
Same floor area+1.9%−0.9% to +4.8%
+ same property type+0.6%−2.2% to +3.4%
+ same build period+7.4%+2.5% to +12.5%
+ same year of sale+2.9%−1.0% to +7.0%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in BA11 1

EPC band (last certificate before sale)SalesMedian £ per m²
A26£4,200
B332£3,333
C453£3,248
D455£3,288
E201£3,110
F36£2,861
G11£2,528

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached76£3,66245£3,646
Semi-detached183£3,54099£3,444
Terraced314£3,251426£3,274
Flat / maisonette238£2,979133£2,793

Compared with the wider area

AreaSalesLike-for-like95% range
Sector BA11 11,514+2.9%−1.0% to +7.0%
District BA116,452−0.1%−1.4% to +1.3%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in BA11 1 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)144 (2,723 meters)
Median gas use per meter (median of postcodes)8,442 kWh
Gas-heated homes with an EPC2,217
Energy implied by their certificates (median)12,606 kWh
Metered gas as a share of the certificate figure (median of 140 postcodes)54% (middle half 42%–68%)

Certificates by band imply: A 3,581 kWh (19 homes) · B 6,616 kWh (453 homes) · C 10,676 kWh (841 homes) · D 20,159 kWh (655 homes) · E 31,914 kWh (228 homes) · F 51,074 kWh (20 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in BA11 1?

SSEN does not publish spare capacity for street substations, so this is the answer for the wider district fed by the Frome primary substation (33/11 kV), not for your street. Its winter demand headroom for 2027 is 12.3 MVA (lowest of SSEN's scenarios) — room for about 7,220 heat pumps at 1.7 kW each, or 78% of the 9,301 gas-heated homes with an energy certificate in its supply area.

Primary substationShare of the sector's gas homesHeadroom 2027Gas homes in its areaRoom for heat pumpsHeadroom 2030 / 2035 (Holistic Transition)
Frome100%12.3 MVA9,301≈ 7,220 (78%)10.1 / 1.7 MVA

Across the sector, about 1,720 of 2,211 gas-heated homes (78%) could switch within the primary substations' 2027 headroom.

Caveat: a primary substation feeds a whole town or several villages. Your street's own substation can be full while the primary has room, and the other way round. Headroom: SSEN Network Scenario Headroom Report 2026, winter demand headroom after contracted connections (MVA ≈ MW). Homes: postcodes whose centre lies inside SSEN's published supply area (19 October 2026). A full primary substation means reinforcement (usually a delay), not a refusal. All areas and the method.

1,514 of 1,712 house and flat sales in the sector since 2015 (88%) were matched to a certificate.

How this is calculated

Caveats