A small premium for a better EPC here. In postcode sector WN6 0 (Wigan), comparing like with like — same floor area, property type, build period and year of sale — homes rated C or better sold for 3.9% more (95% range +1.8% to +6.0%). The raw gap is bigger: C+ homes sold for 24% more per square metre than D–G homes (median £2,626 vs £2,117, 3,734 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+3.9% ▲like-for-like: small premium (95% range +1.8% to +6.0%)
+24%raw gap per m² (before like-for-like)
3,734sales matched to a certificate
61%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 99 m² against 85 m² for D–G; the most common build period is 2012 onwards for C+ and 1930–1949 for D–G; 82% of C+ and 77% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)+24%—
Whole price, nothing held equal+34.2%+30.4% to +38.0%
Same floor area+21.7%+19.3% to +24.1%
+ same property type+16.5%+14.5% to +18.6%
+ same build period+8.9%+6.2% to +11.6%
+ same year of sale+3.9%+1.8% to +6.0%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in WN6 0

EPC band (last certificate before sale)SalesMedian £ per m²
A13£3,208
B1,579£2,687
C752£2,347
D1,095£2,162
E245£1,917
F38£2,111
G12£1,708

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached1,376£2,710440£2,500
Semi-detached554£2,458637£2,126
Terraced221£2,435295£1,536
Flat / maisonette193£2,17718£1,818

Compared with the wider area

AreaSalesLike-for-like95% range
Sector WN6 03,734+3.9%+1.8% to +6.0%
District WN67,832+3.7%+2.3% to +5.2%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in WN6 0 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)302 (7,091 meters)
Median gas use per meter (median of postcodes)10,821 kWh
Gas-heated homes with an EPC4,963
Energy implied by their certificates (median)13,726 kWh
Metered gas as a share of the certificate figure (median of 290 postcodes)61% (middle half 54%–75%)

Certificates by band imply: A 5,551 kWh (29 homes) · B 7,892 kWh (1,763 homes) · C 13,982 kWh (1,192 homes) · D 19,714 kWh (1,564 homes) · E 29,550 kWh (376 homes) · F 41,473 kWh (39 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in WN6 0?

About 3,560 of the 4,963 gas-heated homes with an energy certificate in WN6 0 (72%) could switch to a heat pump before their local substations run out of spare capacity, on SP Electricity North West's figures. 17 of the 39 local substations would fill up before every gas-heated home they supply could switch; 1 is already at or over capacity.

Local (street) substations serving homes in the sector39
Already at or over capacity1 (3%)
Their combined spare capacity (demand headroom)≈ 9,390 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 5,520
Gas-heated homes with an EPC on these substations4,963
Of them, could switch within the spare capacity≈ 3,560 (72%)
…if each heat pump adds 3 kW (a cold snap)≈ 2,440 (49%)

How: each substation's spare capacity (transformer demand headroom in kVA, from estimated maximum demand) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes whose nearest SP Electricity North West substation it is (supply areas are not published). Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is SP Electricity North West's figure as published on 24 March 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

3,734 of 3,882 house and flat sales in the sector since 2015 (96%) were matched to a certificate.

How this is calculated

Caveats