Too few comparable sales here for a reliable like-for-like figure. In postcode sector WC2B 5 (Westminster), comparing like with like — same floor area, property type, build period and year of sale — there are too few comparable sales in each group for a reliable figure; for district WC2B as a whole the like-for-like difference is −0.3% (95% range −7.1% to +7.0%). The raw gap is bigger: C+ homes sold for 5% more per square metre than D–G homes (median £16,098 vs £15,312, 106 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

−0.3%like-for-like in district WC2B (95% range −7.1% to +7.0%); too few sales in this sector
+5%raw gap per m² (before like-for-like)
106sales matched to a certificate
57%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 63 m² against 51 m² for D–G; the most common build period is 2012 onwards for C+ and 1900–1929 for D–G.

This sector has fewer than 150 matched sales, fewer than 30 in one group, or an estimate too imprecise or implausibly large to trust, so the like-for-like comparison is not shown; the district figure is above.

Sold prices by EPC band in WC2B 5

EPC band (last certificate before sale)SalesMedian £ per m²
B13£17,259
C48£15,062
D30£15,319
E12£15,147
F3too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Flat / maisonette61£16,09845£15,312

Compared with the wider area

AreaSalesLike-for-like95% range
Sector WC2B 5106too few—
District WC2B122−0.3%−7.1% to +7.0%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in WC2B 5 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)28 (357 meters)
Median gas use per meter (median of postcodes)5,411 kWh
Gas-heated homes with an EPC332
Energy implied by their certificates (median)9,048 kWh
Metered gas as a share of the certificate figure (median of 25 postcodes)57% (middle half 48%–71%)

Certificates by band imply: B 5,494 kWh (15 homes) · C 7,832 kWh (233 homes) · D 12,966 kWh (77 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in WC2B 5?

Yes, on UK Power Networks' figures: the local substations serving WC2B 5 have enough spare capacity for all 332 gas-heated homes with an energy certificate here to switch to a heat pump. None of the 38 local substations would fill up first.

Local (street) substations serving homes in the sector38
Already at or over capacity0 (0%)
Their combined spare capacity (demand headroom)≈ 17,450 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 10,260
Gas-heated homes with an EPC on these substations332
Of them, could switch within the spare capacity≈ 330 (100%)
…if each heat pump adds 3 kW (a cold snap)≈ 330 (99%)

How: each substation's spare capacity (UK Power Networks publishes utilisation in 20% bands; we take the low end of the spare-capacity band) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes whose centre lies inside the substation's published supply area. Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is UK Power Networks' figure as published on 15 June 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

106 of 173 house and flat sales in the sector since 2015 (61%) were matched to a certificate.

How this is calculated