EPC Price Check

Does a C-or-better EPC sell for more in SS1 1 (Southend-on-Sea)?

A small premium for a better EPC here. In postcode sector SS1 1 (Southend-on-Sea), comparing like with like — same floor area, property type, build period and year of sale — homes rated C or better sold for 10.5% more (95% range +4.2% to +17.3%). The raw gap is different: C+ homes sold for 9% more per square metre than D–G homes (median £3,500 vs £3,223, 590 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+10.5% ▲like-for-like: small premium (95% range +4.2% to +17.3%)
+9%raw gap per m² (before like-for-like)
590sales matched to a certificate
66%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 53 m² against 70 m² for D–G; the most common build period is 1991–1995 for C+ and 1900–1929 for D–G; 2% of C+ and 10% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)+9%—
Whole price, nothing held equal−23.8%−29.8% to −17.3%
Same floor area+5.2%+0.2% to +10.6%
+ same property type+9.2%+4.1% to +14.6%
+ same build period+15.1%+8.3% to +22.3%
+ same year of sale+10.5%+4.2% to +17.3%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in SS1 1

EPC band (last certificate before sale)SalesMedian £ per m²
B46£3,523
C191£3,483
D233£3,364
E99£2,886
F15£3,274
G6too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached3—11£3,049
Semi-detached2—25£3,387
Terraced14£4,000125£3,553
Flat / maisonette218£3,464192£3,056

Compared with the wider area

AreaSalesLike-for-like95% range
Sector SS1 1590+10.5%+4.2% to +17.3%
District SS14,476+4.4%+2.3% to +6.6%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in SS1 1 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)61 (1,437 meters)
Median gas use per meter (median of postcodes)9,240 kWh
Gas-heated homes with an EPC1,243
Energy implied by their certificates (median)14,765 kWh
Metered gas as a share of the certificate figure (median of 61 postcodes)66% (middle half 55%–82%)

Certificates by band imply: B 5,275 kWh (44 homes) · C 9,982 kWh (417 homes) · D 16,557 kWh (592 homes) · E 26,238 kWh (180 homes) · F 43,277 kWh (10 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in SS1 1?

About 990 of the 1,211 gas-heated homes with an energy certificate in SS1 1 (81%) could switch to a heat pump before their local substations run out of spare capacity, on UK Power Networks' figures. 3 of the 25 local substations would fill up before every gas-heated home they supply could switch.

Local (street) substations serving homes in the sector25
Already at or over capacity0 (0%)
Their combined spare capacity (demand headroom)≈ 10,580 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 6,220
Gas-heated homes with an EPC on these substations1,211 (97% of the sector's)
Of them, could switch within the spare capacity≈ 990 (81%)
…if each heat pump adds 3 kW (a cold snap)≈ 830 (69%)

How: each substation's spare capacity (UK Power Networks publishes utilisation in 20% bands; we take the low end of the spare-capacity band) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes whose centre lies inside the substation's published supply area. Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is UK Power Networks' figure as published on 15 June 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

590 of 764 house and flat sales in the sector since 2015 (77%) were matched to a certificate.

How this is calculated

Caveats