Does a C-or-better EPC sell for more in SR8 4 (County Durham)?

No measurable EPC premium here. In postcode sector SR8 4 (County Durham), comparing like with like — same floor area, property type, build period and year of sale — the difference is +3.3% (95% range −1.9% to +8.9%): the EPC band itself is not reflected in sale prices here. The raw gap is bigger: C+ homes sold for 50% more per square metre than D–G homes (median £815 vs £544, 1,445 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+3.3%like-for-like: no measurable difference (95% range −1.9% to +8.9%)
+50%raw gap per m² (before like-for-like)
1,445sales matched to a certificate
62%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 76 m² against 72 m² for D–G; both groups are most often built in 1900–1929; 30% of C+ and 20% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)+50%—
Whole price, nothing held equal+37.4%+27.8% to +47.7%
Same floor area+29.7%+21.5% to +38.6%
+ same property type+21.5%+15.0% to +28.4%
+ same build period+12.7%+6.8% to +19.0%
+ same year of sale+3.3%−1.9% to +8.9%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in SR8 4

EPC band (last certificate before sale)SalesMedian £ per m²
B8too few
C413£807
D739£602
E214£473
F50£387
G21£397

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached35£1,59735£1,359
Semi-detached92£1,133169£1,014
Terraced291£579818£465
Flat / maisonette3—2—

Compared with the wider area

AreaSalesLike-for-like95% range
Sector SR8 41,445+3.3%−1.9% to +8.9%
District SR85,433+3.4%+1.1% to +5.9%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in SR8 4 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)162 (3,528 meters)
Median gas use per meter (median of postcodes)9,983 kWh
Gas-heated homes with an EPC2,899
Energy implied by their certificates (median)15,947 kWh
Metered gas as a share of the certificate figure (median of 155 postcodes)62% (middle half 51%–72%)

Certificates by band imply: B 7,849 kWh (37 homes) · C 13,258 kWh (1,351 homes) · D 18,623 kWh (1,208 homes) · E 26,096 kWh (289 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in SR8 4?

About 2,030 of the 2,792 gas-heated homes with an energy certificate in SR8 4 (73%) could switch to a heat pump before their local substations run out of spare capacity, on Northern Powergrid's figures. 7 of the 18 local substations would fill up before every gas-heated home they supply could switch.

Local (street) substations serving homes in the sector18
Already at or over capacity0 (0%)
Their combined spare capacity (demand headroom)≈ 6,700 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 3,940
Gas-heated homes with an EPC on these substations2,792 (96% of the sector's)
Of them, could switch within the spare capacity≈ 2,030 (73%)
…if each heat pump adds 3 kW (a cold snap)≈ 1,480 (53%)

How: each substation's spare capacity (transformer headroom in kW, from last year's maximum demand) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes listed by Northern Powergrid as fed by the substation. Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is Northern Powergrid's figure as published on 3 August 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

Supported by Northern Powergrid Open Data.

1,445 of 1,512 house and flat sales in the sector since 2015 (96%) were matched to a certificate.

How this is calculated

Caveats