Too few comparable sales here for a reliable like-for-like figure. In postcode sector SR1 1 (Sunderland), comparing like with like — same floor area, property type, build period and year of sale — there are too few comparable sales in each group for a reliable figure; for district SR1 as a whole the like-for-like difference is +7.2% (95% range −1.2% to +16.4%). The raw gap is bigger: C+ homes sold for 68% more per square metre than D–G homes (median £2,067 vs £1,228, 204 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+7.2%like-for-like in district SR1 (95% range −1.2% to +16.4%); too few sales in this sector
+68%raw gap per m² (before like-for-like)
204sales matched to a certificate
62%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 31 m² against 58 m² for D–G; both groups are most often built in 2012 or later.

This sector has fewer than 150 matched sales, fewer than 30 in one group, or an estimate too imprecise or implausibly large to trust, so the like-for-like comparison is not shown; the district figure is above.

Sold prices by EPC band in SR1 1

EPC band (last certificate before sale)SalesMedian £ per m²
B43£1,049
C127£3,059
D26£2,649
E3too few
F2too few
G3too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Flat / maisonette170£2,06734£1,228

Compared with the wider area

AreaSalesLike-for-like95% range
Sector SR1 1204too few—
District SR1380+7.2%−1.2% to +16.4%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in SR1 1 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)18 (217 meters)
Median gas use per meter (median of postcodes)11,749 kWh
Gas-heated homes with an EPC173
Energy implied by their certificates (median)12,782 kWh
Metered gas as a share of the certificate figure (median of 13 postcodes)62% (middle half 37%–94%)

Certificates by band imply: B 6,913 kWh (12 homes) · C 10,991 kWh (97 homes) · D 19,109 kWh (48 homes) · E 30,265 kWh (15 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in SR1 1?

About 170 of the 173 gas-heated homes with an energy certificate in SR1 1 (100%) could switch to a heat pump before their local substations run out of spare capacity, on Northern Powergrid's figures. 1 of the 16 local substations would fill up before every gas-heated home they supply could switch.

Local (street) substations serving homes in the sector16
Already at or over capacity0 (0%)
Their combined spare capacity (demand headroom)≈ 9,110 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 5,360
Gas-heated homes with an EPC on these substations173
Of them, could switch within the spare capacity≈ 170 (100%)
…if each heat pump adds 3 kW (a cold snap)≈ 170 (99%)

How: each substation's spare capacity (transformer headroom in kW, from last year's maximum demand) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes listed by Northern Powergrid as fed by the substation. Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is Northern Powergrid's figure as published on 3 August 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

Supported by Northern Powergrid Open Data.

204 of 324 house and flat sales in the sector since 2015 (63%) were matched to a certificate.