Does a C-or-better EPC sell for more in SO14 7 (Southampton)?

Too few comparable sales here for a reliable like-for-like figure. In postcode sector SO14 7 (Southampton), comparing like with like — same floor area, property type, build period and year of sale — there are too few comparable sales in each group for a reliable figure; for district SO14 as a whole the like-for-like difference is +1.1% (95% range −1.1% to +3.3%). The raw gap is bigger: C+ homes sold for 8% less per square metre than D–G homes (median £3,487 vs £3,778, 140 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+1.1%like-for-like in district SO14 (95% range −1.1% to +3.3%); too few sales in this sector
−8%raw gap per m² (before like-for-like)
140sales matched to a certificate
43%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 75 m² against 49 m² for D–G; both groups are most often built in 2012 or later.

This sector has fewer than 150 matched sales, fewer than 30 in one group, or an estimate too imprecise or implausibly large to trust, so the like-for-like comparison is not shown; the district figure is above.

Sold prices by EPC band in SO14 7

EPC band (last certificate before sale)SalesMedian £ per m²
B48£3,333
C38£4,014
D37£3,942
E8too few
F8too few
G1too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Flat / maisonette86£3,48754£3,778

Compared with the wider area

AreaSalesLike-for-like95% range
Sector SO14 7140too few—
District SO143,540+1.1%−1.1% to +3.3%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in SO14 7 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)3 (43 meters)
Median gas use per meter (median of postcodes)8,033 kWh
Gas-heated homes with an EPC44
Energy implied by their certificates (median)10,345 kWh
Metered gas as a share of the certificate figure (median of 2 postcodes)43% (middle half 34%–52%)

Certificates by band imply: B 6,133 kWh (15 homes) · C 11,012 kWh (17 homes) · D 16,779 kWh (10 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in SO14 7?

SSEN does not publish spare capacity for street substations, so this is the answer for the wider district fed by the Western Esplanade primary substation (33/11 kV), not for your street. Its winter demand headroom for 2027 is 27.3 MVA (lowest of SSEN's scenarios) — room for about 16,040 heat pumps at 1.7 kW each, enough for all 3,625 gas-heated homes with an energy certificate in its supply area.

Primary substationShare of the sector's gas homesHeadroom 2027Gas homes in its areaRoom for heat pumpsHeadroom 2030 / 2035 (Holistic Transition)
Western Esplanade100%27.3 MVA3,625≈ 16,040 (100%)26.7 / 21.2 MVA

Across the sector, about 40 of 44 gas-heated homes (100%) could switch within the primary substations' 2027 headroom.

Caveat: a primary substation feeds a whole town or several villages. Your street's own substation can be full while the primary has room, and the other way round. Headroom: SSEN Network Scenario Headroom Report 2026, winter demand headroom after contracted connections (MVA ≈ MW). Homes: postcodes whose centre lies inside SSEN's published supply area (19 October 2026). A full primary substation means reinforcement (usually a delay), not a refusal. All areas and the method.

140 of 156 house and flat sales in the sector since 2015 (90%) were matched to a certificate.

How this is calculated