EPC Price Check

Does a C-or-better EPC sell for more in PO30 2 (Isle of Wight)?

No measurable EPC premium here. In postcode sector PO30 2 (Isle of Wight), comparing like with like — same floor area, property type, build period and year of sale — the difference is −1.9% (95% range −4.8% to +1.1%): the EPC band itself is not reflected in sale prices here. The raw gap is bigger: C+ homes sold for 18% more per square metre than D–G homes (median £2,856 vs £2,412, 1,500 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

−1.9%like-for-like: no measurable difference (95% range −4.8% to +1.1%)
+18%raw gap per m² (before like-for-like)
1,500sales matched to a certificate
50%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 71 m² against 81 m² for D–G; the most common build period is 2012 onwards for C+ and 1967–1975 for D–G; 47% of C+ and 68% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)+18%—
Whole price, nothing held equal+1.4%−2.2% to +5.2%
Same floor area+9.4%+6.2% to +12.7%
+ same property type+15.5%+12.5% to +18.6%
+ same build period+0.7%−2.8% to +4.4%
+ same year of sale−1.9%−4.8% to +1.1%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in PO30 2

EPC band (last certificate before sale)SalesMedian £ per m²
B573£3,000
C368£2,554
D403£2,423
E120£2,392
F28£2,451
G8too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached105£3,000179£2,917
Semi-detached337£3,104202£2,322
Terraced373£2,846138£2,105
Flat / maisonette126£2,45940£2,012

Compared with the wider area

AreaSalesLike-for-like95% range
Sector PO30 21,500−1.9%−4.8% to +1.1%
District PO305,645−3.3%−4.9% to −1.8%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in PO30 2 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)111 (2,289 meters)
Median gas use per meter (median of postcodes)7,105 kWh
Gas-heated homes with an EPC1,714
Energy implied by their certificates (median)13,822 kWh
Metered gas as a share of the certificate figure (median of 109 postcodes)50% (middle half 44%–57%)

Certificates by band imply: B 6,621 kWh (139 homes) · C 12,016 kWh (773 homes) · D 17,115 kWh (644 homes) · E 27,254 kWh (142 homes) · F 38,784 kWh (12 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in PO30 2?

SSEN does not publish spare capacity for street substations, so this is the answer for the wider district fed by the Newport primary substation (33/11 kV), not for your street. Its winter demand headroom for 2027 is 29.0 MVA (lowest of SSEN's scenarios) — room for about 17,040 heat pumps at 1.7 kW each, enough for all 6,476 gas-heated homes with an energy certificate in its supply area.

Primary substationShare of the sector's gas homesHeadroom 2027Gas homes in its areaRoom for heat pumpsHeadroom 2030 / 2035 (Holistic Transition)
Newport (upstream constraint)99%29.0 MVA6,476≈ 17,040 (100%)28.8 / 22.6 MVA

Across the sector, about 1,609 of 1,609 gas-heated homes (100%) could switch within the primary substations' 2027 headroom.

Caveat: a primary substation feeds a whole town or several villages. Your street's own substation can be full while the primary has room, and the other way round. Headroom: SSEN Network Scenario Headroom Report 2026, winter demand headroom after contracted connections (MVA ≈ MW). Homes: postcodes whose centre lies inside SSEN's published supply area (19 October 2026). A full primary substation means reinforcement (usually a delay), not a refusal. All areas and the method.

1,500 of 1,549 house and flat sales in the sector since 2015 (97%) were matched to a certificate.

How this is calculated

Caveats