EPC Price Check

Does a C-or-better EPC sell for more in OL13 9 (Rossendale)?

No measurable EPC premium here. In postcode sector OL13 9 (Rossendale), comparing like with like — same floor area, property type, build period and year of sale — the difference is +4.7% (95% range 0.0% to +9.6%): the EPC band itself is not reflected in sale prices here. The raw gap is bigger: C+ homes sold for 39% more per square metre than D–G homes (median £1,900 vs £1,363, 1,325 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+4.7%like-for-like: no measurable difference (95% range 0.0% to +9.6%)
+39%raw gap per m² (before like-for-like)
1,325sales matched to a certificate
58%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 95 m² against 83 m² for D–G; the most common build period is 2012 onwards for C+ and before 1900 for D–G; 79% of C+ and 42% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)+39%—
Whole price, nothing held equal+59.2%+51.1% to +67.8%
Same floor area+47.3%+41.1% to +53.8%
+ same property type+21.5%+16.7% to +26.4%
+ same build period+12.1%+5.5% to +19.1%
+ same year of sale+4.7%0.0% to +9.6%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in OL13 9

EPC band (last certificate before sale)SalesMedian £ per m²
A1too few
B78£2,022
C505£1,886
D498£1,473
E210£1,245
F26£1,145
G7too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached345£1,974136£1,840
Semi-detached115£1,990176£1,580
Terraced123£1,438424£1,132
Flat / maisonette1—5—

Compared with the wider area

AreaSalesLike-for-like95% range
Sector OL13 91,325+4.7%0.0% to +9.6%
District OL132,821+4.1%+0.8% to +7.4%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in OL13 9 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)163 (3,250 meters)
Median gas use per meter (median of postcodes)10,544 kWh
Gas-heated homes with an EPC2,570
Energy implied by their certificates (median)17,055 kWh
Metered gas as a share of the certificate figure (median of 158 postcodes)58% (middle half 46%–71%)

Certificates by band imply: A 4,844 kWh (20 homes) · B 8,204 kWh (233 homes) · C 14,248 kWh (1,119 homes) · D 21,308 kWh (914 homes) · E 33,990 kWh (249 homes) · F 46,946 kWh (34 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in OL13 9?

About 2,260 of the 2,570 gas-heated homes with an energy certificate in OL13 9 (88%) could switch to a heat pump before their local substations run out of spare capacity, on SP Electricity North West's figures. 6 of the 34 local substations would fill up before every gas-heated home they supply could switch.

Local (street) substations serving homes in the sector34
Already at or over capacity0 (0%)
Their combined spare capacity (demand headroom)≈ 9,390 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 5,520
Gas-heated homes with an EPC on these substations2,570
Of them, could switch within the spare capacity≈ 2,260 (88%)
…if each heat pump adds 3 kW (a cold snap)≈ 1,800 (70%)

How: each substation's spare capacity (transformer demand headroom in kVA, from estimated maximum demand) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes whose nearest SP Electricity North West substation it is (supply areas are not published). Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is SP Electricity North West's figure as published on 24 March 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

1,325 of 1,409 house and flat sales in the sector since 2015 (94%) were matched to a certificate.

How this is calculated

Caveats