EPC Price Check

Does a C-or-better EPC sell for more in GU27 2 (Waverley)?

No measurable EPC premium here. In postcode sector GU27 2 (Waverley), comparing like with like — same floor area, property type, build period and year of sale — the difference is +1.2% (95% range −2.9% to +5.4%): the EPC band itself is not reflected in sale prices here. The raw gap is bigger: C+ homes sold for 10% less per square metre than D–G homes (median £4,545 vs £5,035, 766 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+1.2%like-for-like: no measurable difference (95% range −2.9% to +5.4%)
−10%raw gap per m² (before like-for-like)
766sales matched to a certificate
71%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 77 m² against 105 m² for D–G; the most common build period is 2003–2006 for C+ and 1900–1929 for D–G; 31% of C+ and 64% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)−10%—
Whole price, nothing held equal−25.5%−32.5% to −17.7%
Same floor area−5.9%−9.9% to −1.8%
+ same property type+2.6%−1.5% to +6.8%
+ same build period+3.8%−0.8% to +8.5%
+ same year of sale+1.2%−2.9% to +5.4%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in GU27 2

EPC band (last certificate before sale)SalesMedian £ per m²
A1too few
B38£4,418
C250£4,637
D318£5,036
E129£5,194
F25£4,500
G5too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached65£5,729176£5,680
Semi-detached25£5,333130£5,000
Terraced44£4,65779£5,088
Flat / maisonette155£4,07692£3,968

Compared with the wider area

AreaSalesLike-for-like95% range
Sector GU27 2766+1.2%−2.9% to +5.4%
District GU272,837−1.3%−3.4% to +0.8%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in GU27 2 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)112 (1,657 meters)
Median gas use per meter (median of postcodes)14,147 kWh
Gas-heated homes with an EPC1,303
Energy implied by their certificates (median)19,597 kWh
Metered gas as a share of the certificate figure (median of 108 postcodes)71% (middle half 60%–80%)

Certificates by band imply: B 8,256 kWh (92 homes) · C 12,007 kWh (477 homes) · D 23,966 kWh (520 homes) · E 39,250 kWh (185 homes) · F 56,717 kWh (25 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in GU27 2?

SSEN does not publish spare capacity for street substations, so this is the answer for the wider district fed by the Haslemere primary substation (33/11 kV), not for your street. Its winter demand headroom for 2027 is 9.7 MVA (lowest of SSEN's scenarios) — room for about 5,700 heat pumps at 1.7 kW each, enough for all 4,763 gas-heated homes with an energy certificate in its supply area.

Primary substationShare of the sector's gas homesHeadroom 2027Gas homes in its areaRoom for heat pumpsHeadroom 2030 / 2035 (Holistic Transition)
Haslemere100%9.7 MVA4,763≈ 5,700 (100%)9.3 / 5.4 MVA

Across the sector, about 1,300 of 1,303 gas-heated homes (100%) could switch within the primary substations' 2027 headroom.

Caveat: a primary substation feeds a whole town or several villages. Your street's own substation can be full while the primary has room, and the other way round. Headroom: SSEN Network Scenario Headroom Report 2026, winter demand headroom after contracted connections (MVA ≈ MW). Homes: postcodes whose centre lies inside SSEN's published supply area (19 October 2026). A full primary substation means reinforcement (usually a delay), not a refusal. All areas and the method.

766 of 904 house and flat sales in the sector since 2015 (85%) were matched to a certificate.

How this is calculated

Caveats