EPC Price Check

Does a C-or-better EPC sell for more in CA21 2 (Cumberland)?

Too few comparable sales here for a reliable like-for-like figure. In postcode sector CA21 2 (Cumberland), comparing like with like — same floor area, property type, build period and year of sale — there are too few comparable sales in each group for a reliable figure. The raw gap is different: C+ homes sold for 1% more per square metre than D–G homes (median £1,881 vs £1,856, 149 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+1%raw gap per m² (before like-for-like)
149sales matched to a certificate
55%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 141 m² against 100 m² for D–G; the most common build period is 1983–1990 for C+ and before 1900 for D–G; 88% of C+ and 85% of D–G sales are detached or semi-detached houses.

This sector has fewer than 150 matched sales, fewer than 30 in one group, or an estimate too imprecise or implausibly large to trust, so the like-for-like comparison is not shown.

Sold prices by EPC band in CA21 2

EPC band (last certificate before sale)SalesMedian £ per m²
B3too few
C22£1,880
D70£2,003
E42£1,745
F11£1,638
G1too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached17£1,88184£2,028
Semi-detached5—22£1,736
Terraced3—18£1,597

Compared with the wider area

AreaSalesLike-for-like95% range
Sector CA21 2149too few—
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in CA21 2 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)17 (234 meters)
Median gas use per meter (median of postcodes)14,017 kWh
Gas-heated homes with an EPC157
Energy implied by their certificates (median)22,642 kWh
Metered gas as a share of the certificate figure (median of 17 postcodes)55% (middle half 44%–61%)

Certificates by band imply: C 21,743 kWh (37 homes) · D 22,173 kWh (85 homes) · E 40,889 kWh (22 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in CA21 2?

About 150 of the 157 gas-heated homes with an energy certificate in CA21 2 (98%) could switch to a heat pump before their local substations run out of spare capacity, on SP Electricity North West's figures. 1 of the 12 local substations would fill up before every gas-heated home they supply could switch.

Local (street) substations serving homes in the sector12
Already at or over capacity0 (0%)
Their combined spare capacity (demand headroom)≈ 1,610 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 950
Gas-heated homes with an EPC on these substations157
Of them, could switch within the spare capacity≈ 150 (98%)
…if each heat pump adds 3 kW (a cold snap)≈ 150 (96%)

How: each substation's spare capacity (transformer demand headroom in kVA, from estimated maximum demand) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes whose nearest SP Electricity North West substation it is (supply areas are not published). Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is SP Electricity North West's figure as published on 24 March 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

149 of 157 house and flat sales in the sector since 2015 (95%) were matched to a certificate.

How this is calculated

Caveats