EPC Price Check

Does a C-or-better EPC sell for more in CA10 2 (Westmorland and Furness)?

No measurable EPC premium here. In postcode sector CA10 2 (Westmorland and Furness), comparing like with like — same floor area, property type, build period and year of sale — the difference is −5.3% (95% range −12.1% to +2.0%): the EPC band itself is not reflected in sale prices here. The raw gap is different: C+ homes sold for 4% more per square metre than D–G homes (median £2,533 vs £2,427, 671 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

−5.3%like-for-like: no measurable difference (95% range −12.1% to +2.0%)
+4%raw gap per m² (before like-for-like)
671sales matched to a certificate
60%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 118 m² against 100 m² for D–G; the most common build period is 2012 onwards for C+ and before 1900 for D–G; 85% of C+ and 73% of D–G sales are detached or semi-detached houses.

Comparing C+ with D–G homes…Difference95% range
Raw gap per m² (medians)+4%—
Whole price, nothing held equal+13.8%+5.7% to +22.4%
Same floor area+6.4%+1.5% to +11.5%
+ same property type+5.1%+0.4% to +10.0%
+ same build period+4.2%−4.1% to +13.2%
+ same year of sale−5.3%−12.1% to +2.0%

The first row compares median prices per m²; the second compares whole prices; each later row adds one more thing that must be equal, ending with the like-for-like premium (regression of log price; build period from the certificate, 12 bands). The raw gap per m² and the whole-price gap differ because C+ and D–G homes differ in size.

Sold prices by EPC band in CA10 2

EPC band (last certificate before sale)SalesMedian £ per m²
A5too few
B146£2,715
C120£2,483
D169£2,388
E146£2,529
F66£2,439
G19£1,729

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Detached157£2,542188£2,668
Semi-detached73£2,769103£2,299
Terraced32£2,25798£2,395
Flat / maisonette9—11£1,814

Compared with the wider area

AreaSalesLike-for-like95% range
Sector CA10 2671−5.3%−12.1% to +2.0%
District CA102,448−2.1%−5.4% to +1.4%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in CA10 2 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)27 (447 meters)
Median gas use per meter (median of postcodes)12,220 kWh
Gas-heated homes with an EPC392
Energy implied by their certificates (median)15,469 kWh
Metered gas as a share of the certificate figure (median of 26 postcodes)60% (middle half 48%–69%)

Certificates by band imply: B 10,219 kWh (142 homes) · C 15,908 kWh (114 homes) · D 23,243 kWh (103 homes) · E 38,310 kWh (29 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in CA10 2?

About 180 of the 392 gas-heated homes with an energy certificate in CA10 2 (47%) could switch to a heat pump before their local substations run out of spare capacity, on SP Electricity North West's figures. 5 of the 101 local substations would fill up before every gas-heated home they supply could switch; 3 are already at or over capacity.

Local (street) substations serving homes in the sector101
Already at or over capacity3 (3%)
Their combined spare capacity (demand headroom)≈ 8,610 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 5,070
Gas-heated homes with an EPC on these substations392
Of them, could switch within the spare capacity≈ 180 (47%)
…if each heat pump adds 3 kW (a cold snap)≈ 140 (35%)

How: each substation's spare capacity (transformer demand headroom in kVA, from estimated maximum demand) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes whose nearest SP Electricity North West substation it is (supply areas are not published). Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is SP Electricity North West's figure as published on 24 March 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

671 of 739 house and flat sales in the sector since 2015 (91%) were matched to a certificate.

How this is calculated

Caveats