Does a C-or-better EPC sell for more in BL1 1 (Bolton)?

Too few comparable sales here for a reliable like-for-like figure. In postcode sector BL1 1 (Bolton), comparing like with like — same floor area, property type, build period and year of sale — there are too few comparable sales in each group for a reliable figure; for district BL1 as a whole the like-for-like difference is +0.3% (95% range −1.1% to +1.7%). The raw gap is bigger: C+ homes sold for 8% more per square metre than D–G homes (median £2,452 vs £2,272, 74 sales 2015–2026), mostly because they are different homes. Across England and Wales the like-for-like figure is +1.2%. Data: HM Land Registry Price Paid to 30 September 2026 matched to the EPC register.

Data: sales January 2015 – September 2026, EPC register November 2026, gas 2024 · calculated 5 November 2026 · Methodology and sources

+0.3%like-for-like in district BL1 (95% range −1.1% to +1.7%); too few sales in this sector
+8%raw gap per m² (before like-for-like)
74sales matched to a certificate
64%metered gas, % of certificate estimate (rough)

From the raw gap to like-for-like

The homes are not alike: C+ homes here have a median floor area of 43 m² against 55 m² for D–G; both groups are most often built in 2012 or later.

This sector has fewer than 150 matched sales, fewer than 30 in one group, or an estimate too imprecise or implausibly large to trust, so the like-for-like comparison is not shown; the district figure is above.

Sold prices by EPC band in BL1 1

EPC band (last certificate before sale)SalesMedian £ per m²
B10£2,762
C35£2,442
D18£2,421
E7too few
G4too few

A median is shown when a band has at least 10 sales.

C or better vs D–G, by property type

TypeC+ salesC+ £/m²D–G salesD–G £/m²
Terraced11£2,7550—
Flat / maisonette34£2,44229£2,272

Compared with the wider area

AreaSalesLike-for-like95% range
Sector BL1 174too few—
District BL19,415+0.3%−1.1% to +1.7%
England and Wales1,000,000 (sample)+1.2%+0.9% to +1.5%

Average gas use in BL1 1 (2024): meters vs certificates

A rough comparison: the certificate figure is an upper-bound estimate (primary energy including lighting, converted with one factor), so treat the share as an order of magnitude.

Postcodes with published gas data (5+ meters)6 (88 meters)
Median gas use per meter (median of postcodes)10,917 kWh
Gas-heated homes with an EPC76
Energy implied by their certificates (median)7,276 kWh
Metered gas as a share of the certificate figure (median of 2 postcodes)64% (middle half 58%–70%)

Certificates by band imply: C 6,612 kWh (60 homes). Across England and Wales, real use is much closer to the certificate for A–C homes than for D–G homes, so the saving an upgrade promises is usually smaller than the certificate suggests.

Certificate energy = primary energy per m² × floor area ÷ 1.13, for homes whose latest certificate shows mains gas heating; it also covers lighting and other uses, so it is an upper bound for gas. DESNZ gas is weather-corrected and covers all meters in the postcode, with or without a certificate.

Can the local grid take heat pumps in BL1 1?

Yes, on SP Electricity North West's figures: the local substations serving BL1 1 have enough spare capacity for all 74 gas-heated homes with an energy certificate here to switch to a heat pump. None of the 27 local substations would fill up first.

Local (street) substations serving homes in the sector27
Already at or over capacity0 (0%)
Their combined spare capacity (demand headroom)≈ 18,360 kVA
Heat pumps that spare capacity could take, at 1.7 kW each≈ 10,800
Gas-heated homes with an EPC on these substations74 (97% of the sector's)
Of them, could switch within the spare capacity≈ 70 (100%)
…if each heat pump adds 3 kW (a cold snap)≈ 70 (100%)

How: each substation's spare capacity (transformer demand headroom in kVA, from estimated maximum demand) is divided by 1.7 kW, the extra winter peak one heat pump adds once many are spread over a street; a substation can take as many heat pumps as that allows, shared among the gas-heated homes on all its postcodes whose nearest SP Electricity North West substation it is (supply areas are not published). Some substations also serve neighbouring sectors, so their whole capacity is counted here and there. Spare capacity is SP Electricity North West's figure as published on 24 March 2026; network operators must still be told about each heat pump, and a full substation means reinforcement (usually a delay), not a refusal. Homes without an energy certificate are not counted. All areas and the method.

74 of 126 house and flat sales in the sector since 2015 (59%) were matched to a certificate.

How this is calculated