EPC Price Check

Solar panels, heat pumps and insulation in Riverside South conservation area

In the Riverside South conservation area (Kingston upon Thames), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Kingston upon Thames covers part of this area (about 24% of it), but the published data does not say which rights it removes — check the direction before any work. The area has 12 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 191 homes inside the boundary have an energy certificate: 74.3% are solid-wall homes with no wall insulation, 90.1% heat with a gas boiler and 60.7% are rated D–G; 0 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

191homes with an energy certificate
74.3%solid walls, no insulation
90.1%heated by a gas boiler
0heat pumps

Article 4: An Article 4 direction published by Kingston upon Thames covers part of this area (about 24% of it), but the published data does not say which rights it removes — check the direction before any work. (Seething Wells Filter Beds)

What needs planning permission in Riverside South

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the council, unless an Article 4 direction removes it — check with the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceNo permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 191)

WallsHomesShare
Solid wall (brick or stone), no insulation14274.3%
Cavity wall, filled3216.8%
Cavity wall, unfilled94.7%
Timber frame42.1%
Cavity wall, insulated (as built or unspecified)10.5%
Cavity wall, internal or external insulation10.5%
Modern wall (U-value from the design)10.5%
Solid wall, insulated10.5%
HeatingHomesShare
Gas boiler17290.1%
Electric (storage heaters, panels, boiler)147.3%
Communal heating52.6%
Loft / roof insulationHomesShare
No insulation3819.9%
Under 200 mm2513.1%
200 mm or more84.2%
Insulated (depth not recorded)147.3%
Flat or other home above10555.0%
Other10.5%
WindowsHomesShare
Double glazed16988.5%
Single glazed2111.0%
Secondary glazing10.5%

Energy rating: B 2 (1.0%) · C 73 (38.2%) · D 82 (42.9%) · E 31 (16.2%) · F 2 (1.0%) · G 1 (0.5%). Houses and bungalows: 22% of the homes; solar panels on 0.0% of the certificates. Most common build period on the certificates: 1930-1949. Designated: 11 February 2003.

Compared with Kingston upon Thames and England

Share of homesRiverside SouthAll 28 areas in Kingston upon ThamesEngland
Solid walls, no insulation74.3%57.0%48.7%
Gas boiler90.1%81.2%66.4%
Rated D–G60.7%—56.5%

Caveats

All conservation areas in Kingston upon Thames · The rules for every conservation area

Guides: Heat pumps · Solar panels · External wall insulation · Replacement windows · Am I in a conservation area? Postcode checker