In the Town Park Netteswell Cross conservation area (Harlow), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Harlow covers this area but deals with other things (such as changes of use); it does not change the rules below. The area has 5 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 35 homes inside the boundary have an energy certificate: 49% are solid-wall homes with no wall insulation, 83% heat with a gas boiler and 57% are rated D–G; 0 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

35homes with an energy certificate
49%solid walls, no insulation
83%heated by a gas boiler
0heat pumps

Article 4: An Article 4 direction published by Harlow covers this area but deals with other things (such as changes of use); it does not change the rules below. (HMO - townwide)

What needs planning permission in Town Park Netteswell Cross

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development)Part 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development)Part 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceNo permission needed (permitted development)Part 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 35)

WallsHomesShare
Solid wall (brick or stone), no insulation1749%
Timber frame926%
Cavity wall, filled26%
Cavity wall, insulated (as built or unspecified)26%
Cavity wall, partly insulated26%
Solid wall, insulated26%
Modern wall (U-value from the design)13%
HeatingHomesShare
Gas boiler2983%
Electric (storage heaters, panels, boiler)514%
Oil13%
Loft / roof insulationHomesShare
No insulation617%
Under 200 mm411%
200 mm or more1440%
Insulated (depth not recorded)926%
Flat or other home above13%
Other13%
WindowsHomesShare
Double glazed2983%
Secondary glazing411%
Single glazed26%

Energy rating: A 1 (3%) · B 2 (6%) · C 12 (34%) · D 8 (23%) · E 10 (29%) · F 2 (6%). Houses and bungalows: 86% of the homes; solar panels on 0% of the certificates. Most common build period on the certificates: 1900-1929. Designated: 1 January 1993.

Compared with Harlow and England

Share of homesTown Park Netteswell CrossAll 10 areas in HarlowEngland
Solid walls, no insulation49%26.1%48.7%
Gas boiler83%83.5%66.4%
Rated D–G57%—56.5%

Caveats

All conservation areas in Harlow · The rules for every conservation area