Solar panels, heat pumps and insulation in Herne Bay conservation area

In the Herne Bay conservation area (Canterbury), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Canterbury covers this area, but the published data does not say which rights it removes — check the direction before any work. The area has 41 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 3,383 homes inside the boundary have an energy certificate: 55.6% are solid-wall homes with no wall insulation, 70.1% heat with a gas boiler and 59.7% are rated D–G; 19 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

3,383homes with an energy certificate
55.6%solid walls, no insulation
70.1%heated by a gas boiler
19heat pumps

Article 4: An Article 4 direction published by Canterbury covers this area, but the published data does not say which rights it removes — check the direction before any work. (Dwelling houses in Herne Bay Conservation Area)

What needs planning permission in Herne Bay

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the council, unless an Article 4 direction removes it — check with the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceNo permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 3,383)

WallsHomesShare
Solid wall (brick or stone), no insulation1,88055.6%
Cavity wall, insulated (as built or unspecified)42812.7%
Modern wall (U-value from the design)2748.1%
Cavity wall, unfilled2126.3%
Cavity wall, filled1975.8%
Timber frame1303.8%
Other or not known1043.1%
Solid wall, internal insulation762.2%
Solid wall, insulated391.2%
Cavity wall, partly insulated220.7%
Solid wall, partly insulated110.3%
Cavity wall, internal or external insulation80.2%
Solid wall, external insulation20.1%
HeatingHomesShare
Gas boiler2,37370.1%
Electric (storage heaters, panels, boiler)77923.0%
Communal heating2036.0%
Heat pump190.6%
LPG60.2%
Oil20.1%
Solid fuel (wood, coal)10.0%
Loft / roof insulationHomesShare
No insulation45413.4%
Under 200 mm59917.7%
200 mm or more51515.2%
Insulated (depth not recorded)2487.3%
Flat or other home above1,38540.9%
Other1825.4%
WindowsHomesShare
Double glazed2,84784.2%
Single glazed42312.5%
Secondary glazing1123.3%
Triple glazed10.0%

Energy rating: A 1 (0.0%) · B 309 (9.1%) · C 1,052 (31.1%) · D 1,309 (38.7%) · E 605 (17.9%) · F 84 (2.5%) · G 23 (0.7%). Houses and bungalows: 30% of the homes; solar panels on 0.4% of the certificates. Most common build period on the certificates: before 1900. Designated: 3 July 1970.

Compared with Canterbury and England

Share of homesHerne BayAll 98 areas in CanterburyEngland
Solid walls, no insulation55.6%36.5%48.7%
Gas boiler70.1%73.7%66.4%
Rated D–G59.7%—56.5%

Caveats

All conservation areas in Canterbury · The rules for every conservation area