In the Wood Street conservation area (Barnet), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Barnet covers this area and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), painting the outside, so there these need planning permission too. The area has 31 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 575 homes inside the boundary have an energy certificate: 43.5% are solid-wall homes with no wall insulation, 69.9% heat with a gas boiler and 44.9% are rated D–G; 1 has a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

575homes with an energy certificate
43.5%solid walls, no insulation
69.9%heated by a gas boiler
1heat pumps

Article 4: An Article 4 direction published by Barnet covers this area and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), painting the outside, so there these need planning permission too. (Article 4 Small Houses in Multiple Occupation (HMO) Area 1; Article 4 for Wood Street CA Area 1; Article 4 for Wood Street CA Area 2)

What needs planning permission in Wood Street

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development)Part 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development)Part 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearancePlanning permission needed (an Article 4 direction here removes this right)Part 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 575)

WallsHomesShare
Solid wall (brick or stone), no insulation25043.5%
Cavity wall, insulated (as built or unspecified)13122.8%
Modern wall (U-value from the design)9616.7%
Solid wall, insulated274.7%
Timber frame183.1%
Cavity wall, unfilled162.8%
Solid wall, internal insulation152.6%
Cavity wall, filled91.6%
Cavity wall, partly insulated50.9%
Other or not known50.9%
Solid wall, partly insulated20.3%
Cavity wall, internal or external insulation10.2%
HeatingHomesShare
Gas boiler40269.9%
Electric (storage heaters, panels, boiler)13022.6%
Communal heating417.1%
Heat pump10.2%
Solid fuel (wood, coal)10.2%
Loft / roof insulationHomesShare
No insulation569.8%
Under 200 mm9316.2%
200 mm or more6511.3%
Insulated (depth not recorded)7713.4%
Flat or other home above21737.8%
Other6611.5%
WindowsHomesShare
Double glazed48684.5%
Single glazed7212.5%
Secondary glazing152.6%
Triple glazed20.3%

Energy rating: B 102 (17.7%) · C 215 (37.4%) · D 185 (32.2%) · E 65 (11.3%) · F 7 (1.2%) · G 1 (0.2%). Houses and bungalows: 22% of the homes; solar panels on 0.0% of the certificates. Most common build period on the certificates: 1900-1929. Designated: 25 April 1969.

Compared with Barnet and England

Share of homesWood StreetAll 16 areas in BarnetEngland
Solid walls, no insulation43.5%48.2%48.7%
Gas boiler69.9%84.8%66.4%
Rated D–G44.9%—56.5%

Caveats

All conservation areas in Barnet · The rules for every conservation area