In the Mill Hill conservation area (Barnet), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Barnet covers this area and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), painting the outside, so there these need planning permission too. The area has 46 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 977 homes inside the boundary have an energy certificate: 16.9% are solid-wall homes with no wall insulation, 40.0% heat with a gas boiler and 24.6% are rated D–G; 7 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

977homes with an energy certificate
16.9%solid walls, no insulation
40.0%heated by a gas boiler
7heat pumps

Article 4: An Article 4 direction published by Barnet covers this area and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), painting the outside, so there these need planning permission too. (Article 4 Agricultural Land Restriction Area 2; Article 4 Agricultural Land Restriction Area 3; Article 4 Small Houses in Multiple Occupation (HMO) Area 1; Article 4 for Mill Hill CA Area 1; Article 4 for Mill Hill CA Area 2; Article 4 for Mill Hill CA Area 3)

What needs planning permission in Mill Hill

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development)Part 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development)Part 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearancePlanning permission needed (an Article 4 direction here removes this right)Part 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 977)

WallsHomesShare
Modern wall (U-value from the design)65667.1%
Solid wall (brick or stone), no insulation16516.9%
Cavity wall, insulated (as built or unspecified)575.8%
Solid wall, insulated363.7%
Cavity wall, unfilled313.2%
Timber frame80.8%
Cavity wall, filled60.6%
Other or not known60.6%
Cavity wall, partly insulated50.5%
Solid wall, internal insulation50.5%
Cavity wall, internal or external insulation20.2%
HeatingHomesShare
Communal heating57158.4%
Gas boiler39140.0%
Electric (storage heaters, panels, boiler)80.8%
Heat pump70.7%
Loft / roof insulationHomesShare
No insulation353.6%
Under 200 mm596.0%
200 mm or more909.2%
Insulated (depth not recorded)646.6%
Flat or other home above47648.7%
Other25325.9%
WindowsHomesShare
Double glazed92194.3%
Single glazed424.3%
Secondary glazing121.2%
Other10.1%
Triple glazed10.1%

Energy rating: A 1 (0.1%) · B 625 (64.0%) · C 111 (11.4%) · D 186 (19.0%) · E 44 (4.5%) · F 8 (0.8%) · G 2 (0.2%). Houses and bungalows: 25% of the homes; solar panels on 0.3% of the certificates. Most common build period on the certificates: 2023. Designated: 20 December 1968.

Compared with Barnet and England

Share of homesMill HillAll 16 areas in BarnetEngland
Solid walls, no insulation16.9%48.2%48.7%
Gas boiler40.0%84.8%66.4%
Rated D–G24.6%—56.5%

Caveats

All conservation areas in Barnet · The rules for every conservation area