EPC Price Check

Solar panels, heat pumps and insulation in Eye conservation area

In the Eye conservation area (Peterborough), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Peterborough covers part of this area (about 2% of it) and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), chimneys, flues and soil pipes, painting the outside, so there these need planning permission too. The area has 9 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 104 homes inside the boundary have an energy certificate: 57.7% are solid-wall homes with no wall insulation, 87.5% heat with a gas boiler and 71.2% are rated D–G; 1 has a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

104homes with an energy certificate
57.7%solid walls, no insulation
87.5%heated by a gas boiler
1heat pumps

Article 4: An Article 4 direction published by Peterborough covers part of this area (about 2% of it) and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), chimneys, flues and soil pipes, painting the outside, so there these need planning permission too. (11-17 (odd) and 27 High Street, Eye; 12 High Street, Eye; 24 High Street, Eye; 28 High Street, Eye; 64 High Street, Eye; Former Girls School and Former Boys School Crowland Road, Eye)

What needs planning permission in Eye

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development)Part 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development)Part 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceInside the Article 4 part of the area: planning permission needed; elsewhere: no permission needed (permitted development)Part 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 104)

WallsHomesShare
Solid wall (brick or stone), no insulation6057.7%
Cavity wall, insulated (as built or unspecified)2625.0%
Cavity wall, filled43.8%
Cavity wall, unfilled43.8%
Modern wall (U-value from the design)43.8%
Solid wall, internal insulation21.9%
Timber frame21.9%
Cavity wall, internal or external insulation11.0%
Solid wall, external insulation11.0%
HeatingHomesShare
Gas boiler9187.5%
Electric (storage heaters, panels, boiler)1110.6%
Heat pump11.0%
Oil11.0%
Loft / roof insulationHomesShare
No insulation1110.6%
Under 200 mm3129.8%
200 mm or more4240.4%
Insulated (depth not recorded)1110.6%
Flat or other home above54.8%
Other43.8%
WindowsHomesShare
Double glazed9894.2%
Single glazed65.8%

Energy rating: B 5 (4.8%) · C 25 (24.0%) · D 51 (49.0%) · E 19 (18.3%) · F 4 (3.8%). Houses and bungalows: 85% of the homes; solar panels on 1.9% of the certificates. Most common build period on the certificates: before 1900. Designated: 4 March 2002.

Compared with Peterborough and England

Share of homesEyeAll 29 areas in PeterboroughEngland
Solid walls, no insulation57.7%40.0%48.7%
Gas boiler87.5%59.8%66.4%
Rated D–G71.2%—56.5%

Caveats

All conservation areas in Peterborough · The rules for every conservation area