Solar panels, heat pumps and insulation in Birnbeck conservation area

In the Birnbeck conservation area (North Somerset), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by North Somerset covers this area, but the published data does not say which rights it removes — check the direction before any work. The area has 29 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 1,496 homes inside the boundary have an energy certificate: 52.2% are solid-wall homes with no wall insulation, 51.3% heat with a gas boiler and 61.9% are rated D–G; 29 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

1,496homes with an energy certificate
52.2%solid walls, no insulation
51.3%heated by a gas boiler
29heat pumps

Article 4: An Article 4 direction published by North Somerset covers this area, but the published data does not say which rights it removes — check the direction before any work. (Great Weston Conservation Area, Weston-super-Mare; Weston-super-Mare (Birnbeck) Conservation area (1))

What needs planning permission in Birnbeck

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the council, unless an Article 4 direction removes it — check with the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceNo permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 1,496)

WallsHomesShare
Solid wall (brick or stone), no insulation78152.2%
Cavity wall, insulated (as built or unspecified)24116.1%
Modern wall (U-value from the design)1489.9%
Solid wall, internal insulation755.0%
Timber frame503.3%
Cavity wall, partly insulated493.3%
Cavity wall, unfilled463.1%
Solid wall, insulated412.7%
Cavity wall, filled382.5%
Other or not known221.5%
Solid wall, partly insulated40.3%
Cavity wall, internal or external insulation10.1%
HeatingHomesShare
Gas boiler76751.3%
Electric (storage heaters, panels, boiler)65543.8%
Communal heating432.9%
Heat pump291.9%
LPG10.1%
Solid fuel (wood, coal)10.1%
Loft / roof insulationHomesShare
No insulation1298.6%
Under 200 mm1218.1%
200 mm or more1147.6%
Insulated (depth not recorded)1238.2%
Flat or other home above93862.7%
Other714.7%
WindowsHomesShare
Double glazed1,27885.4%
Single glazed19413.0%
Secondary glazing171.1%
Triple glazed50.3%
Other20.1%

Energy rating: A 1 (0.1%) · B 133 (8.9%) · C 436 (29.1%) · D 591 (39.5%) · E 271 (18.1%) · F 49 (3.3%) · G 15 (1.0%). Houses and bungalows: 8% of the homes; solar panels on 0.1% of the certificates. Most common build period on the certificates: before 1900. Designated: 22 May 1984.

Compared with North Somerset and England

Share of homesBirnbeckAll 39 areas in North SomersetEngland
Solid walls, no insulation52.2%56.3%48.7%
Gas boiler51.3%64.6%66.4%
Rated D–G61.9%—56.5%

Caveats

All conservation areas in North Somerset · The rules for every conservation area

Guides: Heat pumps · Solar panels · External wall insulation · Replacement windows · Am I in a conservation area? Postcode checker