EPC Price Check

Solar panels, heat pumps and insulation in Edge Hill conservation area

In the Edge Hill conservation area (Liverpool), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Liverpool covers this area and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), chimneys, flues and soil pipes, so there these need planning permission too. The area has 34 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 127 homes inside the boundary have an energy certificate: 55.1% are solid-wall homes with no wall insulation, 50.4% heat with a gas boiler and 48.8% are rated D–G; 1 has a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

127homes with an energy certificate
55.1%solid walls, no insulation
50.4%heated by a gas boiler
1heat pumps

Article 4: An Article 4 direction published by Liverpool covers this area and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), chimneys, flues and soil pipes, so there these need planning permission too. (Land and Buildings at Edge Lane, Liverpool, L7; The Liverpool (Anfield, Central, Greenbank, Kensington and Fairfield, Picton, Princess Park, Riverside, Tuebrook and Stoneycroft and Wavertree wards and parts of Kirkdale and Church wards) (Article 4(1)) Direction 2020)

What needs planning permission in Edge Hill

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development)Part 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development)Part 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearancePlanning permission needed (an Article 4 direction here removes this right)Part 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 127)

WallsHomesShare
Solid wall (brick or stone), no insulation7055.1%
Solid wall, internal insulation3225.2%
Cavity wall, insulated (as built or unspecified)118.7%
Timber frame53.9%
Cavity wall, filled32.4%
Solid wall, partly insulated32.4%
Cavity wall, unfilled10.8%
Modern wall (U-value from the design)10.8%
Solid wall, insulated10.8%
HeatingHomesShare
Gas boiler6450.4%
Electric (storage heaters, panels, boiler)5946.5%
Communal heating32.4%
Heat pump10.8%
Loft / roof insulationHomesShare
No insulation1411.0%
Under 200 mm1310.2%
200 mm or more3225.2%
Insulated (depth not recorded)86.3%
Flat or other home above5946.5%
Other10.8%
WindowsHomesShare
Double glazed7055.1%
Single glazed5140.2%
Secondary glazing64.7%

Energy rating: B 3 (2.4%) · C 62 (48.8%) · D 36 (28.3%) · E 18 (14.2%) · F 3 (2.4%) · G 5 (3.9%). Houses and bungalows: 28% of the homes; solar panels on 0.0% of the certificates. Most common build period on the certificates: 1900-1929. Designated: 24 April 1996.

Compared with Liverpool and England

Share of homesEdge HillAll 37 areas in LiverpoolEngland
Solid walls, no insulation55.1%41.6%48.7%
Gas boiler50.4%53.3%66.4%
Rated D–G48.8%—56.5%

Caveats

All conservation areas in Liverpool · The rules for every conservation area

Guides: Heat pumps · Solar panels · External wall insulation · Replacement windows · Am I in a conservation area? Postcode checker