In the Forest Hill conservation area (Lewisham), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Lewisham covers this area and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), painting the outside, so there these need planning permission too. The area has 15 listed buildings; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 1,405 homes inside the boundary have an energy certificate: 67.9% are solid-wall homes with no wall insulation, 86.8% heat with a gas boiler and 57.2% are rated D–G; 7 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

1,405homes with an energy certificate
67.9%solid walls, no insulation
86.8%heated by a gas boiler
7heat pumps

Article 4: An Article 4 direction published by Lewisham covers this area and removes permitted development rights for replacement windows and doors, and other alterations to the house, alterations to the roof (e.g. rooflights), painting the outside, so there these need planning permission too. (Forest Hill Article 4 Direction; Forest Hill Article 4(2) Direction; Forest Hill Article 4(3) Direction; Forest Hill District Centre; Small HMO Northern Extension)

What needs planning permission in Forest Hill

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development)Part 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development)Part 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearancePlanning permission needed (an Article 4 direction here removes this right)Part 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 1,405)

WallsHomesShare
Solid wall (brick or stone), no insulation95467.9%
Cavity wall, insulated (as built or unspecified)1399.9%
Modern wall (U-value from the design)805.7%
Cavity wall, unfilled614.3%
Solid wall, internal insulation382.7%
Timber frame372.6%
Cavity wall, partly insulated352.5%
Solid wall, insulated201.4%
Other or not known181.3%
Cavity wall, filled171.2%
Cavity wall, internal or external insulation40.3%
Solid wall, partly insulated20.1%
HeatingHomesShare
Gas boiler1,21986.8%
Electric (storage heaters, panels, boiler)15711.2%
Communal heating191.4%
Heat pump70.5%
LPG30.2%
Loft / roof insulationHomesShare
No insulation20414.5%
Under 200 mm18012.8%
200 mm or more966.8%
Insulated (depth not recorded)1349.5%
Flat or other home above74853.2%
Other433.1%
WindowsHomesShare
Double glazed1,00071.2%
Single glazed34424.5%
Secondary glazing523.7%
Triple glazed90.6%

Energy rating: B 86 (6.1%) · C 516 (36.7%) · D 601 (42.8%) · E 174 (12.4%) · F 22 (1.6%) · G 6 (0.4%). Houses and bungalows: 16% of the homes; solar panels on 0.2% of the certificates. Most common build period on the certificates: 1900-1929. Designated: 1 January 1976.

Compared with Lewisham and England

Share of homesForest HillAll 31 areas in LewishamEngland
Solid walls, no insulation67.9%69.0%48.7%
Gas boiler86.8%85.5%66.4%
Rated D–G57.2%—56.5%