EPC Price Check

Solar panels, heat pumps and insulation in Broadway conservation area

In the Broadway conservation area (Hull), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. 53 homes inside the boundary have an energy certificate: 91% are solid-wall homes with no wall insulation, 98% heat with a gas boiler and 98% are rated D–G; 0 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

53homes with an energy certificate
91%solid walls, no insulation
98%heated by a gas boiler
0heat pumps

Article 4: Hull does not publish Article 4 areas on planning.data.gov.uk — check with the council.

What needs planning permission in Broadway

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the council, unless an Article 4 direction removes it — check with the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceNo permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 53)

WallsHomesShare
Solid wall (brick or stone), no insulation4891%
Cavity wall, filled36%
Cavity wall, unfilled24%
HeatingHomesShare
Gas boiler5298%
Electric (storage heaters, panels, boiler)12%
Loft / roof insulationHomesShare
No insulation713%
Under 200 mm815%
200 mm or more3566%
Insulated (depth not recorded)36%
WindowsHomesShare
Double glazed5298%
Single glazed12%

Energy rating: C 1 (2%) · D 37 (70%) · E 11 (21%) · F 4 (8%). Houses and bungalows: 100% of the homes; solar panels on 0% of the certificates. Most common build period on the certificates: 1900-1929. Designated: 1 January 1994.

Compared with Hull and England

Share of homesBroadwayAll 26 areas in HullEngland
Solid walls, no insulation91%50.5%48.7%
Gas boiler98%66.8%66.4%
Rated D–G98%—56.5%

Caveats

All conservation areas in Hull · The rules for every conservation area

Guides: Heat pumps · Solar panels · External wall insulation · Replacement windows · Am I in a conservation area? Postcode checker