EPC Price Check

Solar panels, heat pumps and insulation in Lea Bridge conservation area

In the Lea Bridge conservation area (Hackney), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. An Article 4 direction published by Hackney covers this area but deals with other things (such as changes of use); it does not change the rules below. The area has 1 listed building; on a listed building solar panels and heat pumps are not permitted development at all and need planning permission and listed building consent. 257 homes inside the boundary have an energy certificate: 22.2% are solid-wall homes with no wall insulation, 57.6% heat with a gas boiler and 13.2% are rated D–G; 1 has a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

257homes with an energy certificate
22.2%solid walls, no insulation
57.6%heated by a gas boiler
1heat pumps

Article 4: An Article 4 direction published by Hackney covers this area but deals with other things (such as changes of use); it does not change the rules below. (London borough of Hackney)

What needs planning permission in Lea Bridge

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development)Part 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development)Part 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceNo permission needed (permitted development)Part 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 257)

WallsHomesShare
Modern wall (U-value from the design)9035.0%
Solid wall (brick or stone), no insulation5722.2%
Other or not known5119.8%
Cavity wall, insulated (as built or unspecified)4417.1%
Timber frame83.1%
Solid wall, insulated31.2%
Cavity wall, unfilled20.8%
Solid wall, external insulation20.8%
HeatingHomesShare
Gas boiler14857.6%
Communal heating9737.7%
Electric (storage heaters, panels, boiler)114.3%
Heat pump10.4%
Loft / roof insulationHomesShare
No insulation207.8%
Under 200 mm51.9%
200 mm or more124.7%
Insulated (depth not recorded)2610.1%
Flat or other home above14355.6%
Other5119.8%
WindowsHomesShare
Double glazed25498.8%
Single glazed20.8%
Triple glazed10.4%

Energy rating: B 134 (52.1%) · C 89 (34.6%) · D 26 (10.1%) · E 8 (3.1%). Houses and bungalows: 17% of the homes; solar panels on 0.4% of the certificates. Most common build period on the certificates: 2007-2011. Designated: 1 January 2005.

Compared with Hackney and England

Share of homesLea BridgeAll 37 areas in HackneyEngland
Solid walls, no insulation22.2%50.5%48.7%
Gas boiler57.6%70.8%66.4%
Rated D–G13.2%—56.5%

Caveats

All conservation areas in Hackney · The rules for every conservation area

Guides: Heat pumps · Solar panels · External wall insulation · Replacement windows · Am I in a conservation area? Postcode checker