In the Great Stony School, Chipping Ongar conservation area (Epping Forest), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. 46 homes inside the boundary have an energy certificate: 17% are solid-wall homes with no wall insulation, 80% heat with a gas boiler and 33% are rated D–G; 0 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

46homes with an energy certificate
17%solid walls, no insulation
80%heated by a gas boiler
0heat pumps

Article 4: Epping Forest does not publish Article 4 areas on planning.data.gov.uk — check with the council.

What needs planning permission in Great Stony School, Chipping Ongar

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the council, unless an Article 4 direction removes it — check with the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceNo permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 46)

WallsHomesShare
Solid wall, insulated1328%
Solid wall, internal insulation1226%
Cavity wall, insulated (as built or unspecified)817%
Solid wall (brick or stone), no insulation817%
Modern wall (U-value from the design)511%
HeatingHomesShare
Gas boiler3780%
Communal heating920%
Loft / roof insulationHomesShare
No insulation37%
Under 200 mm49%
200 mm or more1124%
Insulated (depth not recorded)2043%
Flat or other home above715%
Other12%
WindowsHomesShare
Double glazed46100%

Energy rating: B 3 (7%) · C 28 (61%) · D 13 (28%) · E 2 (4%). Houses and bungalows: 74% of the homes; solar panels on 0% of the certificates. Most common build period on the certificates: 1996-2002. Designated: 25 April 1995.

Compared with Epping Forest and England

Share of homesGreat Stony School, Chipping OngarAll 25 areas in Epping ForestEngland
Solid walls, no insulation17%27.5%48.7%
Gas boiler80%64.3%66.4%
Rated D–G33%—56.5%