EPC Price Check

Solar panels, heat pumps and insulation in Sackville Gardens conservation area

In the Sackville Gardens conservation area (Brighton and Hove), external wall insulation needs planning permission, and so does an air source heat pump on a wall or roof facing the road; one at the back or side, internal and loft insulation and solar panels on a roof slope normally do not. 574 homes inside the boundary have an energy certificate: 64.3% are solid-wall homes with no wall insulation, 69.5% heat with a gas boiler and 58.0% are rated D–G; 3 have a heat pump. EPC register November 2026; rules as at 21 October 2026.

Data: EPC register November 2026 (latest certificate per home), conservation area boundaries 3 November 2026, permitted development rules as at 21 October 2026 · calculated 5 November 2026 · Methodology and sources

574homes with an energy certificate
64.3%solid walls, no insulation
69.5%heated by a gas boiler
3heat pumps

Article 4: Brighton and Hove does not publish Article 4 areas on planning.data.gov.uk — check with the council.

What needs planning permission in Sackville Gardens

Work (house, not listed)In a conservation areaRule
Air source heat pump on a wall or roof facing the road, or nearer the road than the housePlanning permission neededPart 14 Class G, G.1(j)
Air source heat pump at the back or side (outdoor unit up to 1.5 m³, MCS Planning Standards, one per house — two on a detached house)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class G
Solar panels on a pitched roof (up to 0.2 m proud, not above the ridge)No permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 14 Class A, A.2(c)
Solar panels on a wall, balcony or roof enclosure facing the roadPlanning permission neededPart 14 Class A, A.2(e)
Solar panels on a flat roof (up to 0.6 m above the roof)Prior approval of appearance from the council, unless an Article 4 direction removes it — check with the councilPart 14 Class A, condition A(ba)
External wall insulation (render, cladding, timber, tiles)Planning permission neededPart 1 Class A, A.2(a)
Internal wall insulation, loft insulation, cavity wall insulationNot development: no planning permission—
Replacement windows and doors of similar appearanceNo permission needed (permitted development), unless an Article 4 direction removes it — check with the councilPart 1 Class A, A.3(a)

The homes in the area (latest certificate per home, n = 574)

WallsHomesShare
Solid wall (brick or stone), no insulation36964.3%
Modern wall (U-value from the design)7913.8%
Cavity wall, filled305.2%
Timber frame264.5%
Cavity wall, insulated (as built or unspecified)203.5%
Cavity wall, unfilled173.0%
Solid wall, insulated152.6%
Solid wall, internal insulation81.4%
Other or not known50.9%
Cavity wall, partly insulated40.7%
Solid wall, partly insulated10.2%
HeatingHomesShare
Gas boiler39969.5%
Electric (storage heaters, panels, boiler)9316.2%
Communal heating7913.8%
Heat pump30.5%
Loft / roof insulationHomesShare
No insulation6311.0%
Under 200 mm7012.2%
200 mm or more447.7%
Insulated (depth not recorded)529.1%
Flat or other home above30753.5%
Other386.6%
WindowsHomesShare
Double glazed43676.0%
Single glazed12722.1%
Secondary glazing111.9%

Energy rating: B 91 (15.9%) · C 150 (26.1%) · D 219 (38.2%) · E 97 (16.9%) · F 13 (2.3%) · G 4 (0.7%). Houses and bungalows: 20% of the homes; solar panels on 0.5% of the certificates. Most common build period on the certificates: before 1900. Designated: 18 February 1997.

Compared with Brighton and Hove and England

Share of homesSackville GardensAll 34 areas in Brighton and HoveEngland
Solid walls, no insulation64.3%67.8%48.7%
Gas boiler69.5%69.3%66.4%
Rated D–G58.0%—56.5%

Caveats

All conservation areas in Brighton and Hove · The rules for every conservation area

Guides: Heat pumps · Solar panels · External wall insulation · Replacement windows · Am I in a conservation area? Postcode checker